CN
New products catalogue icon

New Products Catalog

RFQ List
For any inquiries, please contact our specialists
Download Form
Remove RFQ item icon

Remove RFQ Item

Back

Our Company Successfully Passes the Three-System Audit Once Again

2019-03-06

From March 4 to March 5, 2019, a CQC audit team of 3 experts conducted a re-certification audit of our company's quality, environmental, and occupational health and safety management systems (referred to as the "three systems"). At 8:40 AM on March 4, the audit team held the opening meeting for this "three systems" re-certification audit. Company leaders, management representatives, and department heads attended the opening meeting, which was chaired by the audit team leader, Teacher Chen.

 

375554929944776178

375554929944776178

 

During the two-day audit, based on ISO9001:2015, ISO14001:2015, and ISO45001:2018 audit criteria, the audit team carefully audited the company's leadership, office, business department, and various business divisions in terms of management responsibilities, resource provision, measurement and analysis improvement, process monitoring, work environment, product realization planning, production service provision control, environmental factors and hazard sources, emergency management, operational performance monitoring, combined with internal documentation and supervision site. During the audit, the audit team also conducted detailed exchanges and guidance with company leaders and audited departments on system operation.

Through on-site document review, inquiry, observation, record sampling, and other methods, the audit team collected a large amount of objective evidence, highly praised the effective operation and continuous improvement of our company's "three systems," and fully affirmed the effectiveness of system operation. At the closing meeting, the audit team leader solemnly announced on behalf of the audit team that all audit team members unanimously agreed that this "three systems" re-certification audit was successfully passed. At the same time, the audit team expressed sincere congratulations on the new achievements made by the company under the correct leadership of management and the joint efforts of all employees.

General Manager Pan expressed sincere gratitude to the audit team for their genuine help in the company's "three systems" work, and emphasized that this supervisory audit is another comprehensive inspection of the company's operation status since passing the "three systems" certification, which has far-reaching and important significance for improving the company's management level and enabling the company to develop better and faster. Personnel at all levels of the company should seriously treat the issues and suggestions raised by the audit team, timely formulate corresponding effective corrective measures and management implementation plans, and continuously improve the management system combined with the company's information management system to promote the continuous and effective operation of the company's quality, environmental, and occupational health and safety systems.

 

—— Human Resources and Administration Department Zhang Jinling

Trending News
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-15
Suspension Ball Stud Validation: Pull-Out and Fatigue Requirements Explained
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-14
Tie Rod End vs. Ball Joint: How to Tell Them Apart and Diagnose Wear
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-13
Suspension Parts Replacement Intervals: When to Replace Ball Joints, Control Arm Bushings, Links and Tie Rod Ends
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-12
BMW X5 E70 Front Suspension Parts: OE Cross-Reference and Replacement Guide (2007–2013)
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-11
Safety-Critical Auto Parts Verification: How to Check Suspension and Steering Parts for Authenticity
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-10
Stabilizer Link vs. Sway Bar Link: Function, Wear Signs, and Replacement
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-09
BMW 3 Series (F30/F35) Front Suspension Parts: OE Cross-Reference and Replacement Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-08
Auto Parts Sourcing for Independent Repair Shops: Compliance Requirements and Quality Checklist
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-07
Ball Joint Failure: Symptoms, Safety Risks, and Replacement
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-06
How Engine Mounts Are Tested for Durability: OEM Standards Explained
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-05
Audi A4 (B8/B9) Tie Rod Ends & Stabilizer Links: OE Cross-Reference and Replacement Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-04
EV Suspension Parts Replacement: Common Failure Patterns and a Buyer's Sourcing Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-03
Strut Mount Bearing Problems: Diagnosis and Replacement Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-02
Mercedes-Benz E-Class W212 Front Lower Control Arms: OE Cross-Reference and Replacement Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-09-01
Automotive Rubber Bushing Supplier Qualification: A Buyer's Checklist for Quality, Capacity, and NVH Performance
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-31
Custom Rubber-to-Metal Bonded Parts: What Buyers Should Specify
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-30
Engine Mount Failure Symptoms: Vibration, Clunks, and When to Replace
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-30
How NVH Bushings Improve Ride Comfort in Modern Vehicles
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-30
BMW 5-Series E60/E61 Stabilizer Links & Tie Rod Ends: OE Cross-Reference and Replacement Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-28
Auto Parts Tariff Compliance Checklist: How to Verify Import Duties and Plan Sourcing Costs
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-27
Rubber vs. Polyurethane vs. Hydraulic Bushings: A Buyer's Comparison Guide
Our Company Successfully Passes the Three-System Audit Once Again
2026-08-25
Anti-Dumping Compliance for Auto Parts Exports: Supplier Sunset Review Self-Assessment Checklist
Our Company Successfully Passes the Three-System Audit Once Again
2020-12-30
Company Approved as Anhui Province New R&D Institution